Ventilation
A ventilation system is not chosen from a catalogue: it is designed for a particular building — according to the use of the space, the number of occupants, the kitchen equipment and the room available for ductwork. We carry out the site survey, the design and the air flow calculation, the supply of equipment, the installation and the commissioning, and regular maintenance after handover. Most of our projects have been in hospitality — kitchen hoods, extraction and fresh air supply in Belgrade restaurants.
- Kitchen ventilation for hospitality
- Fresh air supply and dry ventilation
- Ductwork and fans
- Air curtains
- Smoke extraction and fire protection

Kitchen ventilation for hospitality
In the kitchen of a restaurant, a hotel or a central kitchen, ventilation does two jobs at once: it extracts grease-laden vapour, smoke and heat from above the cooking equipment and supplies roughly the same volume of fresh air. If the supply is missing, the kitchen runs at negative pressure and draws air from the dining room, so guests sit in the smell of the kitchen. We therefore always design the hood, the extract and the supply together, according to the layout and the rating of the kitchen equipment. We supply eco hoods and conventional versions, with electrostatic and active carbon filters where the exhaust air is discharged close to the windows of neighbouring premises.

- Hoods made to suit the kitchen line — eco hoods and conventional versions
- Electrostatic and active carbon filters
- Extract and supply fans, ducted and roof-mounted
- Ductwork from the hood to the discharge point on the façade or the roof
- Setting the air flow and the balance between supply and extract
- Degreasing and regular service after installation
Fresh air supply and dry ventilation
Dry ventilation is the air change in spaces where no grease deposits occur: dining rooms, offices, retail premises, warehouses and production halls. The system supplies fresh air and extracts stale air, while a heat recovery unit takes the heat from the exhaust air, so outdoor air is not heated from scratch in winter. In larger buildings the air is prepared in an air handling unit — filtered, heated, cooled and humidified where required — and then distributed to the rooms through ductwork.
- Air flow calculation based on the use of the space and the number of occupants
- Supply and extract ductwork with grilles and diffusers
- Heat recovery units on the exhaust air
- Air handling units for larger buildings
- Air filtration, classes G3 to F9
- Air flow measurement and system balancing after installation
Ductwork and fans
Ductwork is the largest part of any ventilation system and the only part that cannot easily be changed once the interior is finished. We therefore plan it at the start of the job: according to the depth available in the suspended ceiling, the route to the façade or the roof and the sound level permitted in the space. We supply and install ducted, roof and wall fans for residential, commercial and industrial buildings, with control panels and frequency inverters where variable speed is required.
- Fabrication and installation of ductwork, including insulation
- Ducted, roof and wall fans
- Grilles, diffusers and control dampers
- Control panels and frequency inverters
- Coordinating the route with the interior and the other services
Air curtains
An air curtain is a downward-facing fan mounted above an entrance door. The jet of air separates the indoor from the outdoor air, so an entrance that stands open loses less heat and admits less dust and fewer insects. Depending on what the building requires, it is supplied with electric heaters or as a hot water unit connected to the existing heating system.
- Versions with electric heaters and hot water versions
- Selection according to the width and height of the entrance opening
- Entrances to restaurants, cafés, hotels, shops and offices
- Installation and connection to the controls
Smoke extraction and fire protection
Ventilation and fire protection are not separate matters: the same ducts that carry air can carry smoke and fire through an entire building, and grease deposits in kitchen ductwork ignite. We carry out the work to European fire protection standards — with insulation of ducts and steel structures, smoke extraction fans, fire alarm panels and fire detectors.
- Insulation of ventilation ducts and steel structures
- Smoke extraction fans
- Fire alarm panels and fire detectors
- Smoke removal from kitchen areas
Who we work for
Buildings we design ventilation for
The same system in a restaurant and in a warehouse is not the same job: the air flows, the sound levels, the room available for ducts and the way the building runs during the day are all different.
Restaurants and cafés
Kitchen line, dining room, bar and ancillary rooms
Hotels
Hotel kitchens, restaurants, conference rooms and common areas
Central kitchens and catering
Food preparation facilities, canteens and staff restaurants
Offices and retail premises
Offices, shops, meeting rooms and sales areas
Production plants and warehouses
Workshops, production halls and storage buildings
Residential buildings
Flats, houses and common areas in apartment buildings
How we work
From the site survey to service
Site survey
We come to the site and record the existing condition, the kitchen equipment and the possible route for the ducts to the façade or the roof.
Design and quotation
We calculate the air flows required, select the equipment and submit a written quotation with a specification of equipment, works and the completion date.
Installation
We fabricate and install the ductwork, the hoods and the fans, including electrical connection and controls, coordinated with the other contractors on site.
Commissioning
We measure the air flows, balance the system to the design values and hand it over in operation.
Service
After handover we take on the maintenance as well: degreasing of kitchen ventilation, duct cleaning and filter replacement.
References
Hospitality venues we have equipped
Ventilation and air conditioning in Belgrade restaurants — from the supply and extract air of the kitchen to the air conditioning of the dining room.

Hospitality
Boutique Cafe & Restaurant
Kitchen eco hood, ventilation ductwork and supply and extract fans

Hospitality
Toro Latin Gastro Bar
Upgraded restaurant ventilation together with VRF air conditioning

Hospitality
Ambar — Balkan cuisine restaurant
VRF air conditioning of the dining room — design, installation and commissioning
Arrange a site survey
We come to the site, record the existing condition and propose a solution with air flows, equipment and a completion date. The quotation is submitted in writing, with a specification of the works.